Full Cycle of a DL Project: You Get Two Days to Collect Data
Andrew Ng walks a face-recognition door system through the entire project lifecycle, and the whole lecture has one thesis: speed. He gives teams a two-day deadline, on the reasoning that 'time spent preparing data should be commensurate with the time it takes to train the model once.' It closes on a line: my job is to build something that actually works, and that is not the same as building something that works on the test set.